Services
The Verde Committment
Verde is committed to making high quality design and construction attainable to the underserved social housing and middle class, in the Caribbean and Central America. Verde and local Development Partners will reliability, cost effectively provide high performance ‘Net Zero’ housing units. Verde’s product + service platform brings a disruptive business model to Developers in the region.
![Screenshot 2022-04-26 080349.jpg](https://static.wixstatic.com/media/bfd054_1cbcf2da2c3340a182dc053fd3c00794~mv2.jpg/v1/fill/w_952,h_531,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/Screenshot%202022-04-26%20080349.jpg)
The Project Delivery System
-
We integrate from concept to occupancy - accelerating and increasing benefits from off-site fabrication & assembly. We complete 75-90% of all hard costs off-site.
-
Our technology and unique housing designs – from single family to townhomes, duplex to multi-plex, with studio, 1, 2 and 3 bedroom models, from single to multi-story structures.
-
Verde offers two main styles – contemporary and traditional, with versatile options, adjusted to the local context.
-
Our designs are pre-engineered and optimized for Net Zero to Net Positive performance and ideal in broader sustainability driven projects.
-
Our housing designs are size and style customizable for any country – also delivering earthquake, hurricane, and other safety benefits.
-
Cost Savings—Developers, and ultimately buyers, save over 50% in typical Architecture and Engineering Fees. Save Time from concept to approved design to completed project – to save over 35% in overall project time and the valuable ‘time to market vs. the competition.
-
Housing units are ordered 3-4 months in advance and completed concurrent to the Developer’s site planning, land development & infrastructure activities, and completed within 1-3 months upon delivery. Over 50% faster than the traditional on-site concrete and concrete block methods.